• Cocopanda@lemmy.world
    link
    fedilink
    arrow-up
    5
    arrow-down
    1
    ·
    7 days ago

    I worked for an EV charger OEM. The industry is literally bottoming out. Before I was laid off. I didn’t have a sales meeting for months.

      • Cocopanda@lemmy.world
        link
        fedilink
        arrow-up
        4
        ·
        7 days ago

        An L1 option, L2 and DCFC’s that we white labeled from a Chinese developer. We had a killer feature for Multi Unit Dwellings. We did true power sharing. Only issue is that you need Cell signal to talk outward and all the chargers had to be within line of sight of at least one charger to do mesh networks. Sometimes we could wirelessly install chargers on multiple floors by stacking them above and below each other.