The real deal y0

  • 1 Post
  • 71 Comments
Joined 1 year ago
cake
Cake day: July 16th, 2023

help-circle








  • Im currently trying to steer a product team to have this kind of process. They are working with an ancient piece of software that is slowly being replaced. However, we need to replace piece by piece while the main app is still being maintained because of law and workflow changes. This is why i want them to set the requirements and designs up front a bit so we can make a good analysis of it before development starts so no technical difficulties or questions arise mid development! However, nothing is set in stone and after each small piece ( aka after each sprint ) we have our review and product owners and stakeholders see what we have made and can chime in, causing us sometimes to pivot what we were making.
    Best of both worlds!


  • Agile has its uses, but like everything you need a bit of both. You need a bit of both waterfall and agile.
    Example : you need to have your requirements before development, yes. But how far do you go in your requirements? If i were to make all the requirements for my current project ill still be busy in 3 years and will have to redo bits due to law and workflows changing. however , we need requirements to start development. We need to know what we need to make and what general direction it will be heading to a make correct software/code design.

    Agile also teaches you about feedback loops, which even with waterfall, you need to have to know that what youre developing is still up to spec with what the product owner is expecting. So even with waterfall, deliver features in parts or sit together at least once every x weeks to see if youre still good with the code/look/design.

    Pure agile is bullshit, but so is pure waterfall. Anything that isnt a mix is bullshit and in the end, it all depends on the project, the team and the time/money constraints.









  • Yes!
    They have released multiple new mainboards for the framework 13 which upgraded the cpu. This is a new mainboard with the latest intel cpus. They have always allowed everyone to just buy the board so they can upgrade their existing framework 13’s, thats their whole stick : modularity.
    This time they also have a new screen panel and battery you could get to upgrade your system.

    Also obviously new systems can be bought with the new hardware from the get go too.

    I have a framework 16 that my boss got for me. Im a trial to see if we can save money by going framework instead of dell for the laptops developers use as things like the ports on the side, batteries and mainboards are easily replaced and upgraded. No need to waste +2600 euro every 3 years per laptop either if we can just swap the mainboard. They didnt want to finance the gpu, but when the laptop is mine after 3 years i will probably get the gpu for it :)
    (In a framework 16 a gpu can be plugged in or replaced. Framework 13’s always use integrated gpu )