I think you mean McDonnell Douglas, it’s what happens when companies fire all the engineers in charge and replace them with beancounters.
friendly neighborhood kbin.run admin, possibly a sentient lifeform… likes pizza and beer.
professional pixie wrangler and rf magician
Mbin contributor and maintainer, aka nobodyatroot on GitHub.
I think you mean McDonnell Douglas, it’s what happens when companies fire all the engineers in charge and replace them with beancounters.
it would have been perfection if they had done this last thursday (on 4/04), add another fail to the list.
i’m almost certain there’s a hentai like this
100%, this is a trap being set for retail investors… not touching this even if I had a 1000ft pole.
Haven’t looked up the station’s license to see how much power they could have been pushing, but if I were the “authorities”, I’d definely be checking local hospitals for records of anyone coming in with mild to severe [RF] burns. With [low frequency] AM stations, the tower itself is basically the other half of the antenna electrically… probably lit them up like a Christmas tree.
i can sort of understand at&t being at&t as they continue to piss hundreds of millions away on subpar investments while continuing to bitch about being poor and needing government handouts to make the boo-boos hurt less, but what does google have to gain from this? and i could have swore that at some point it was mentioned starlink is/was going to use google data centers as PoPs for their ground stations, but maybe i’m miss remembering…
didn’t Verizon overbuild most, if not all, of the area with FiOS? not sure how they’re getting away with it in the rural regions unless there are still CLECs operating. All this to say… fiber still has the issue of power outages and nonfunctioning customer backup batteries in the ONTs and I vaguely remember some drama over Verizon not offering replacement batteries or providing backups at all.